Timeshift Series 16E01 - Bridging the Gap - How the Severn Bridge Was Built
The inside story of the design and construction of the Severn Bridge.
2016 sees the fiftieth anniversary of the Severn Bridge, which completed the motorway link between England and Wales. Timeshift tells the inside story of the design and construction of 'the most perfect suspension bridge in the world', and how its unique slim-line structure arose by accident.
First shown: 19 October 2016
Duration: 1 hour
Media info:
General
Format : MPEG-4
Format profile : Base Media
Codec ID : isom (isom/iso2/avc1/mp41)
File size : 1 004 MiB
Duration : 58mn 32s
Overall bit rate mode : Variable
Overall bit rate : 2 397 Kbps
Writing application : Lavf57.25.100
Video
ID : 1
Format : AVC
Format/Info : Advanced Video Codec
Format profile : [email protected] Format settings, CABAC : Yes
Format settings, ReFrames : 2 frames
Codec ID : avc1
Codec ID/Info : Advanced Video Coding
Duration : 58mn 32s
Bit rate mode : Variable
Bit rate : 2 298 Kbps
Maximum bit rate : 3 500 Kbps
Width : 1 280 pixels
Height : 720 pixels
Display aspect ratio : 16:9
Frame rate mode : Constant
Frame rate : 25.000 fps
Color space : YUV
Chroma subsampling : 4:2:0
Bit depth : 8 bits
Scan type : Progressive
Bits/(Pixel*Frame) : 0.100
Stream size : 962 MiB (96%)
Audio
ID : 2
Format : AAC
Format/Info : Advanced Audio Codec
Format profile : LC
Codec ID : 40
Duration : 58mn 32s
Bit rate mode : Constant
Bit rate : 93.5 Kbps
Channel(s) : 2 channels
Channel positions : Front: L R
Sampling rate : 48.0 KHz
Frame rate : 46.875 fps (1024 spf)
Compression mode : Lossy
Stream size : 39.1 MiB (4%)
|